Bovey Tracey, Devon
View a relevant RIDA project record for a minor-development commission.
View the minor-development flood risk assessment project in Bovey Tracey


In England, minor development for flood-risk policy includes householder development, minor non-residential extensions creating less than 250 square metres of additional floor space, and alterations that do not increase a building’s size.
Get A Free No Obligation QuoteThe evidence required is set by the proposal, flood zone, other flood sources and local planning requirements. Review the official Flood risk and coastal change Planning Practice Guidance and the Environment Agency Flood Map for Planning. You can check your site on the Flood Map for Planning through RIDA before commissioning.
Standing advice may support a straightforward proposal. Specialist assessment may be needed for deeper flooding, multiple flood sources, cumulative extensions, site-level constraints or a planning authority request for further evidence.
For larger or broader schemes, see RIDA’s flood risk assessments for planning permission.
Prefer to discuss the site first? Call RIDA using the verified number shown in the website header.
Get A Free No Obligation Quote| Technical deliverable | What this enables you to progress |
|---|---|
| Proportionate flood risk assessment report | Planning validation, application submission or a response to a case officer |
| Review of relevant flood sources, mapped flood zones and available local evidence | A site-specific risk position based on more than project size |
| Assessment of the proposal and proportionate mitigation measures | Design decisions addressing the identified flood risk |
| Recommendations on levels, access, resilience and surface-water management where relevant | Drawings and supporting planning evidence |
| Identification of further technical work | Early commissioning of modelling, drainage, SuDS or planning-test support |
Hydraulic modelling, drainage or SuDS evidence, or Sequential and Exception Test support may sit outside a straightforward FRA. RIDA’s flood risk consultants can identify the suitable scope. Fees reflect the site, proposal, available data and requested evidence; see the flood risk assessment cost guidance.
You can check the long-term flood risk for an area before sending your enquiry.
View a relevant RIDA project record for a minor-development commission.
View the minor-development flood risk assessment project in Bovey TraceyAn FRA may be required where your site lies within a relevant flood-risk area, another flood source affects the proposal, or the planning authority requests evidence. The project’s small scale does not remove the need automatically.
Standing advice and official templates may suit straightforward cases. Appointing a consultant is appropriate where site levels, local evidence, mitigation, cumulative development or technical planning comments need professional assessment.
Send the site address, proposal plans, a description of the works, planning correspondence, available flood or drainage records and your target submission date.
RIDA will identify the extra work and define a suitable scope. This may include hydraulic modelling, drainage or SuDS evidence, revised mitigation advice, or support for the relevant planning tests.
Send your site address, plans and planning correspondence. RIDA will review the available information and confirm the proposed scope, fee and programme.
Prefer to discuss the site first? Call RIDA using the verified number shown in the website header.
Request a Quote