Call Us

01608 510 121

Email Us

admin@rida-reports.co.uk

Drainage Strategy Major Development

Drainage Strategy Major Developments

  • Price on application
  • Sites with more than 30 dwellings
  • Office and industrial development of more than 50,000 square metre
  • First draft ready within 72 hours

Key Benefits:

  • The drainage strategy will inform the flood risk assessment
  • Assessment of available Geological Records or Site investigation if available
  • Obtain and review Sewer plans
  • Evaluate potential use of SuDS applicable to site
  • Determine climate change allowances
  • Undertake Basic Hydraulic Modelling of foul and surface water
  • Calculate storage volumes to comply with SuDS guidance
  • Indicate discharge points and rates for foul water
  • Indicate applicable SuDS and volume distribution at a principle level
  • Provide single sketch concept of the drainage strategy
  • Allows for one set of consolidated comments / amendments following the first issue of the report

What we need from you:

  • Site Address
  • Site layout
  • Topographical Survey

Latest Reports