Call Us

01608 510 121

Email Us

admin@rida-reports.co.uk

Outline Drainage Strategy for Planning

RIDA prepares outline drainage strategies for developers, land promoters, architects and planning consultants. Your report establishes a feasible surface-water approach, constraints, assumptions and data gaps for pre-application, outline planning or phased development, with outline calculations and a concept plan where commissioned.
Get A Free No Obligation Quote
Outline Drainage Strategy for Planning project image Outline Drainage Strategy for Planning supporting project image
Outline Drainage Strategy for Planning technical project image
21+Years Of Experience

When an Outline Drainage Strategy Is the Right Scope

Commission this service for a pre-application enquiry, outline planning application, land-promotion decision, early feasibility review or phased development. RIDA tests whether a credible drainage approach can be established before detailed engineering is prepared. The report records constraints, assumptions, investigations and matters that may require later approval. It does not guarantee planning acceptance.

Get A Free No Obligation Quote

Need a broader or later-stage report? View RIDA’s drainage strategy service.

Send your site location, proposal, planning stage, available plans and target submission date.

Get A Free No Obligation Quote

What You Will Receive

Technical deliverables and their purpose

Technical deliverableWhat this helps you progress
Site, policy and existing drainage reviewDefines the credible evidence level and material data gaps.
Surface-water hierarchy, indicative discharge route and rateSupports early planning and layout decisions.
Conceptual attenuation, SuDS and exceedance approachSets planning-stage runoff-management parameters.
Climate-change assumptions, outline calculations and concept plan where commissionedProvides proportionate technical evidence for the submission.
Foul drainage commentary where relevant, plus next stepsCreates a clear hand-off for surveys, enquiries and later design.

The approach refers to the National standards for sustainable drainage systems and relevant peak rainfall climate change allowances. Projects moving beyond a concept strategy may require Sustainable Drainage Systems design.

Outline Strategy, Planning Evidence and Detailed Design

An outline strategy establishes feasibility, drainage parameters and unresolved matters. The evidence needed before determination varies by site, proposal and authority. Some details may be secured by planning condition; material feasibility or policy matters may need evidence earlier. The Flood risk and coastal change Planning Practice Guidance provides the national planning context. Construction layouts, final hydraulic calculations and engineering drawings sit within detailed drainage design. See RIDA’s latest planning and drainage update for related policy commentary.

Information Needed to Quote and Start

  • Site address and red-line boundary — to review the site context.
  • Proposed layout, land use and development quantum — to define the assessment scope.
  • Planning stage, reference and target date — to check submission needs and consultee comments.
  • Topographical, drainage, sewer, ground, infiltration and flood-risk information — to assess constraints and evidence gaps.
  • Known discharge, ownership, easement or phasing constraints — to shape the concept strategy.

Outline Drainage Strategy FAQs

Is an outline drainage strategy suitable for an outline planning application?

Yes, where planning-stage evidence can establish drainage feasibility and key parameters. The required detail is set by the site, proposal and local authority requirements.

What information do you need from me before you can start?

Send the site location, red-line plan, proposal, planning stage and available technical information. RIDA will review gaps before confirming the scope.

What will the outline strategy include, and what may need to follow later?

The report may cover discharge, attenuation, conceptual SuDS, exceedance, climate allowances and foul drainage feasibility. Surveys, hydraulic calculations and construction drawings may follow at detailed-design stage.

Can RIDA respond to planning authority or LLFA comments?

RIDA can review and respond to drainage comments within the agreed commission. New surveys, calculations or design work may require a revised scope.

Request an Outline Drainage Strategy Quote

Send your site location, development description, planning stage, available plans and target submission date. RIDA will review the information and define a proportionate scope for your planning submission or feasibility decision.