
90 Settrington Road, London
The Brief
RIDA Reports Ltd was appointed to undertake a detailed flood risk assessment for a proposed development at a residential dwelling located at 90 Settrington Road, Fulham, London (SW6 3BA). The project involves a loft conversion, a rear extension, and the construction of a new basement. The assessment confirmed the site is located within River Flood Zone 3.
Why the Client Chose RIDA
Securing planning permission for developments involving new basements within active flood zones requires a precise understanding of local planning frameworks. The client needed a specialist consultancy capable of delivering a site-specific evaluation in accordance with the London Borough of Hammersmith and Fulham’s Strategic Flood Risk Assessment. RIDA was selected for its proven expertise in evaluating complex fluvial constraints and providing the exact technical evidence necessary to seamlessly support planning applications.
The Challenge
The primary challenge for this site was its location within River Flood Zone 3, indicating a high probability of fluvial flooding. Furthermore, the introduction of a new basement requires meticulous evaluation to ensure that the new subterranean structure does not compromise life safety during extreme weather events or negatively impact local subsurface water flows.
The RIDA Difference
RIDA conducted a comprehensive flood risk assessment, meticulously evaluating the site using Environment Agency data and local strategic flood risk guidelines. To proactively protect against potential flood risks associated with the site’s flood zone classification, RIDA outlined essential mitigation measures, including the strong recommendation to establish a formal Flood Warning and Emergency Response Plan to effectively communicate flood emergency response procedures to all future occupants of the site.
The Outcome
The detailed assessment successfully demonstrated that the proposed loft conversion, rear extension, and basement could be safely accommodated at 90 Settrington Road. By explicitly addressing the fluvial and subterranean constraints through robust emergency planning, RIDA ensured the development will remain secure over its design life. The comprehensive report provided the policy-compliant technical justification required to fully support the client’s planning application without increasing flood risk elsewhere.
