Call Us

01608 510 121

Email Us

admin@rida-reports.co.uk

Flood Risk Assessments Harrow

Our success is based on clear communication and excellence relationship with Harrow Borough Council

RIDA Reports 5 star google reviews in flood risk assessments
Years Of Experience
0 +

Obtain Planning approval using our services

Our highly experienced chartered engineers are abreast of the latest legislation and flood modelling data to protect your development from flooding and make it a reality.  

Our expertise enables us to provide full range of services for any size development. We are able to create river models and assess your development within flood zone 2 and flood zone 3.

 

Flood Risk Assessment Harrow

Our prices are fixed and or reports are delivered on time. Join the developers, architects and consultants that had their planning approved

Flood Risk Appraisal

£750.00
  • Any size development

  • Details site potential within the floodplain before making an investment decision or starting your master plan design

Flood Risk Assessment – Extensions and Change of Use

£750.00

Developments less than 250 square metres within flood zone 2 or 3

Flood Risk Assessment – Single Dwelling

£800.00

Developments less than 1,000 square metres within flood zone 2 or 3

Flood Risk Assessment – Minor Development

£950.00

Developments less than 2500 square metres within flood zone 2 or 3

Learn more about flood risk assessment cost and what factors influence pricing across different development types.

RIDA's Reports Flood Risk Assessments Projects
in Harrow

With experience in Harrow’s differents areas, we know how to handle complex sites and support planning applications across all flood zones.

Our Projects

Kenton Gardens

597 Uxbridge Road Pinner

11 Dorset Drive, Edgware

Our Clients

What Our Customer Says

Steve Morley

MDA Wirral Ltd

We have a long association with RIDA, this is due to their high standards of professionalism and detailed level of information provided. Always efficient, responsive and reliable working with tight deadlines, highly recommended.

James Cogley

Cogley Structural Solutions

We have had the pleasure of working with Arge at RIDA over several years and throughout this time the experience has consistently been very good. What stands out most is their responsiveness – any queries or issues have always been addressed promptly, which has given us great confidence and peace of mind.

Jon Lipka

M&E Design and Build Ltd

I had an excellent experience with RIDA. From start to finish, their team was professional, responsive, and genuinely committed to customer satisfaction. Communication was clear and consistent, and they went above and beyond to make sure everything was done right on site at Soho Farmhouse.

The benefits of using our flood risk assessments for your planning application

Our Flood Risk Assessment methodology

We work collaboratively with architects, planning consultants, Harrow Council Infrastructure Department and the Environment Agency to give your development the best chance to get planning.

The flood risk assessment methodology includes:

Our flood risk assessment methodology is based on obtaining the best possible data and using our engineering judgement and experience to get your development through planning.

A drainage strategy must include:

What is included in our Drainage Strategies

A sustainable drainage strategy should be provided as part of the flood risk assessment. Discharging water to the combined drainage system is not acceptable.

When would you get your flood risk assessment?

You will get the initial flood risk assessment in 48hrs of our appointment

We start the discussions with the council right away and with your design team to get the flood risk assessment and drainage strategy completed.

These timescales vary dramatically depending on the complexity of the site and the availability of information and people to complete or provide the information required.

In general, the fastest report that has been approved without comments is two weeks. The longest is one month and half.

Don’t let flood risk become a planning problem. Get expert advice and a planning-ready Flood Risk Assessment today

Flood Risk Assessment Consultants Harrow

Flood risk assessment consultants in Harrow provide practical, site-specific advice to support planning applications, feasibility studies and development projects across the Borough.

Planning-Ready Flood Risk Assessments

Flood risk assessment consultants in Harrow provide practical, site-specific advice to support planning applications, feasibility studies and development projects across the Borough.

Flood Risk Analysis & Mitigation


Our consultants assess flood risks from river flooding, surface water, drainage systems and local ground conditions across Harrow, as well as providing clear and practical advice on mitigating these risks.

Harrow Expertise & Local Experience

As consultants working throughout Harrow Town, Wealdstone, Pinner and along the River Pinn corridor, we have extensive knowledge of the localised flood risks and the relevant local planning considerations which affect development schemes within the area.

When do I need a flood risk assessment?

Harrow Borough Council is one the most advanced councils in England in proactively managing surface water flooding. You need a flood risk assessment if your development falls within:

Developments falling under Environment Agency Flood Zone 2 and 3 are subject to consultation with the Environment Agency and Harrow Council. Development proposals falling within the Flood Map for Surface Water are subject to consultation with Harrow Council.

Benefits of our Flood Risk Assessments in Harrow

Flood risk assessments provide a detailed analysis of all potential flood sources, offering tailored mitigation strategies for your development in Harrow. You’ll receive a clear, specific and expert report which:

Meets the local and national planning policies

Costs effective in the mitigation of flood risk

Enables you to make informed changes to the design and achieve planning

Safeguard your development from flooding throughout its lifetime

Specific requirements for Harrow Borough council flood risk assessments

The specific food risk requirement in Harrow Borough council are:

We recommend that the flood risk is looked at the start of the design process as this may influence whether your development is feasible. Our Civil and Structural Engineering backgrounds ensures robust solutions that strengthen your planning approval whilst following the Harrow Borough Council advice for flood risk assessments.

Planning a project in Harrow ? Speak to our team today and get clear, reliable flood risk advice for your site.

FAQS

Harrow Borough Council looks after flood risk from surface water under powers given by law by the Government. As per picture below. This is water that flood areas before it reaches the main rivers.

Harrow Surface Water Flooding

Harrow Borough council has instigated the same flood zone classifications given by the Environment Agency to their flood risk from run-off zones and has applied the same requirements stated under the National Policy Framework.

In other words, if you are in a run-off flood risk areas the same principles apply as if you were in a river flood risk area.

The Environment Agency river flood risk area is a shown below. The two sets of information vary dramatically.

Environment Agency Flood Zone Areas

It depends on the flood risk vulnerability classification and the location of the development within the flood zone.

If your development is compatible then you can build with the appropriate risk assessment. Otherwise, you may need an exception test to demonstrate that your development is necessary within the flood zone.

We can help you understand how to get your development underway.

Yes, the Fluvial flood levels, surface water flood and surface water flood depth maps should be submitted as part of the flood risk assessment

The flood extent and surface water flood depth and risk maps can be requested from Harrow Borough Council Infrastructure Department.

Alternatively, the flood extent map(s) can be viewed on Harrow Borough Council website and the flood extent, depth and velocity maps can be viewed on the Joint West London SFRA

The river flood maps and levels can be requested directly from the Environment Agency and be seen in the Environment Agency flood map for planning.

You can also look at our map. You will be able to see the risk of flooding from rivers or sea (planning), flooding from surface water and reservoirs or whether the development is affected by surface water run-off.

We have taken this information directly from the Environment Agency databases and prepared it so you can check in detail if your development need a flood risk assessment.

The maps from the Environment Agency are free.

The flood maps from Harrow Borough Council incur charges as follow:

 
  • Surface Water flood extent map £47.35

  • Surface Water flood depth map £47.35

  • Surface Water flood velocity map £47.35

  • Surface Water flood hazard map £47.35

  • Extract of a detailed river network map £47.35

These charges are for the provision of the flood map and include a basic technical summary. The fee are paid directly to Harrow Borough Council

The flood zone mitigation that apply depend on the depth of floodwater.

For instance, for shallow depth of water up to 300mm (1 foot), the best option is to keep the water out or locating the building above the flood levels. You can do this by including flood gates, walls, raising the final floor level of your property by 300mm above the flood level.

For deeper depths of water, you will be looking at building materials, foundations, floor, walls, fittings, services, doors and windows that minimise water entry whilst maintaining structural integrity.

For water entry, we look at materials and construction techniques that facilitate drying  and cleaning.

Our mitigation strategy will be in line with the CLG 2007 'Improving the Flood Performance of New Buildings' publication.

Harrow Borough Councils flood risk team request that a compensatory flood storage volume is calculated for all developments within surface water flood zone 3a and 3b.

The Environment Agency also requests compensatory flood storage for developments located in flood zone 3 and 2.

The compensatory flood storage for both cases should comply with the following requirements:

 
  • It should be provided on level for level and volume for volume basis by gradually lowering ground levels

  • Flood water with the storage should flow freely out of the lowered area when flooding recedes

  • It should be located next to the flood zone wherever possible

  • The volume of the CFS provided must be equal to the volume of floodwater displaced by the development

 

For both authorities (The Environment Agency and Harrow Borough Council) the following information is required:

 
  • Site plan indicating the proposed and existing development

  • Flood zone showing the extent and depth of the flood area for the existing and proposed development

  • Calculations showing the proposed area of displaced flood water and the compensatory storage area

  • Cross-sections showing proposed and existing ground levels in relation to finished floor levels

  • Digital terrain model showing the flood in relation to the development

This is the additional work that is required to complete the flood risk assessment and drainage strategy and its costs:

  • Topographical survey cost £400/£600

  • For small extension Satellite LIDAR data can be used as long as the final floor level of the property is known. Cost: £80/£120. We need to agree using this data with the council before we can proceed.

  • Obtain the flood data from the council. Cost: £189.40 approx

  • Sewer records from Thames Water. Cost £59.76

  • Soakaway Tests. Costs £900-£2,500

  • Consultation with the council. Costs: £110.5/hr. Payment is done directly with the council

We know local suppliers who can provide quotes and get the information fast. Contact us to get a better indication of costs and timescales